Several reports describe the achieved results. Those results have been divided into 7 different categories, please click the category to view the available reports. Most of the reports are confidential (CO), in those cases only a public summary is available, which can be quite short.
Result categories
- PV laminate and Sub assembly components development and optimisation
- Smart module power management electronics
- Production/manufacturing technologies
- PV laminate & module pilot production
- Demonstration and evaluation of PV systems in various settings/applications
- Preparative exploitation activities, knowledge management and dissemination
- Project management
1. PV laminate and Sub assembly components development and optimisation
- Performance spec for the complete assembly as well as all individual module components by TPS (CO)
- Encapsulant formulation, 50 kg granulate samples and film rolls of encapsulant materials by YPR (CO)
- Polymer components further optimized, recycling- and environmental study completed by Fraunhofer (CO)
- Pilot run of Flame retardant polymer materials including mechanical property testing by Fraunhofer (CO)
- Design optimized, first pilot run of metal components for 300 PV modules including testing by TPS (CO)
- Small prototype module (BIPV)
- Large 120 cell module
- Tooling design and engineering for polymer components by TPS (CO)
- First pilot run of components for 300 PV modules by Fraunhofer (CO)
2. Smart module power management electronics
- Junction box
- Programme of demands (POD) for Junction Box by SOL (CO)
- Functionally tested trial model Junction Box by SOL (CO)
- Functionally tested prototypes Junction Box by SOL (CO)
- Field tested smart Junction Box and pre-certification (50-200 pcs) by SOL (CO)
- Validation of the manufacturability (> 500 pcs), Junction Box by KIWA (CO)
- Zero series Junction Box (> 5,000 pcs, actual number to be decided) and definite certification, production line tools ready for mass production by SOL (CO)
- Module power management electronics
- Programme of demands (POD) for module power management electronics by FTG (CO)
- Functionally tested trial model (PCB plus ASIC + software) of module power management electronics by FTG (CO)
- Functionally tested prototypes of module power management electronics (approx. 5 pcs) by FTG (CO)
- Field tested smart module power management electronics and pre-certification (50-200 pcs) by FTG (CO)
- Validation of the manufacturability (> 500 pcs), electronics by KIWA (CO)
- Zero series smart module power management electronics (> 5,000 pcs, actual number to be decided) and definite certification, production line tools ready for mass production by FTG (CO)
- Design and prototype of new junction box design with all electronics integrated by SOL (CO)
3. Production/manufacturing technologies
- Feasibility demonstration of COSMOS PV laminates production with prototype gluing & assembly equipment designed by Rimas by TPS (CO)
- Design tools and processes for pilot assembly & gluing station for first COSMOS prototypes by RTG (CO)
- Feasibility demonstration for developing glueing machine by RTG (CO)
- Adapted tools for validation of Cosmos PV module by KIWA (CO)
4. PV laminate & module pilot production
- Specs PV laminate by TPS (CO)
- Production modules by TPS (PU)
- Serial produced components by Fraunhofer (CO)
- First prototypes by TPS (PU)
- First validated modules by KIWA (PU)
5. Demonstration and evaluation of PV systems in various settings/applications
- Production of mounting material by IBC (CO)
- Selection of demonstration projects by IBC (CO)
- Long term evaluation by KIWA (PU)
- Reliable product compare by IBC (CO)
- 2-3 field demonstrations (PV installations) by IBC (PU)
- Validation of the installation procedures by KIWA (PU)
6. Preparative exploitation activities, knowledge management and dissemination
- Business / Market deployment Plan by TPS (CO)
- Marketing plan by TPS (CO)
- Dissemination plan by UNR (PU)
- Website by UNR (PU)
- E-newsletters, etc. by UNR (PU)
- Showcases: Dissemination Truck by TPS (PU) and/or view this page
- Showcases: Static show cases by TPS (PU) and/or read this article
- Showcases: Dissemination of results with truck on at least 50 “audience locations” by TPS (PU)
7. Project management
- Risk management plan at start up of the project by TPS (CO)
- Risk management progress report by TPS (CO)
- 3 monthly project progress reports from management also showing the justified use of resources per beneficiary by UNR (CO)